Confirm the equipment and document revision
Record the manufacturer, model, intended room and current planning-document revision. Ask the equipment supplier and appointed technical specialists to confirm that the documents apply to the selected configuration. General examples are not a substitute for the final installation requirements.
Review the room and building services
Have the design team and equipment specialists review the required space, operating and service clearances, structural support, power, cooling, plumbing and network connections as applicable. Assign each review to a named party and record its status.
Check delivery and installation
Confirm the delivery route, unloading arrangements, access restrictions, temporary storage, installation sequence and responsibilities with the supplier and contractor. Record the dates by which the room and building services must be ready.
Record readiness and acceptance
List the evidence required before delivery and before use. Identify who confirms installation, testing, training and operational acceptance. Keep unresolved items and changes in the register until the appointed party confirms closure.
Use an equipment-readiness register
Record these fields for each open requirement. Use the current manufacturer documents and the appointed specialists' confirmations.
- Room and equipment reference
- Requirement and source-document revision
- Responsible reviewer and required decision
- Target date, status and confirmation evidence
- Effect on delivery or installation if unresolved
Manufacturer planning references
GE HealthCare site-planning documents
Siemens Healthineers implementation and site planning
These references are manufacturer resources, not Northmark affiliations. Confirm the selected equipment and current document revision with the supplier.
Put this guide to work.
Use the blank worksheet to record responsibilities, dates and outstanding information.
Open the worksheet